Qwen3-Coder-Next — Aug 3 Preview lock
Timezone: WIB (UTC+7)
Target listing: 2026-08-03 12:00
Content freeze: 2026-08-02 18:00
| Field | Locked posture |
|---|---|
| Public class | Day-0 Preview, not ship or hero |
| Hero CTA | null without a new dated promotion receipt |
| Role | Interactive coding Preview |
| Artifact | Official FP8 at the exact revision in config.yaml |
| Runtime | Immutable vLLM 0.25.1 container digest |
| Day-0 GGUF | Unsupported |
| Evidence | Historical API/chat availability 2/2 only |
| Public promotion before listing | false |
| Candidate status | READY_FOR_FREEZE_REVIEW |
| Clock status | BLOCKED_until_2026-08-02_freeze_attestation |
| Verified runnable on exact pinned runtime | false; no live receipt |
Listing readiness
The source is a freeze-review candidate when repository tests pass: exact FP8
verification, immutable runtime taxonomy, conservative Spark defaults, local-daemon
host-loopback publication with explicit auth limits, real root config, and honest
claim labels. The release remains blocked
until the Aug 2 freeze attestation, including operator confirmation of host
quiescence. A new quality measurement is not required to list a Preview, but
without a live exact-runtime receipt this candidate is not runnable_day0 verified.
Measured, hero, tool-reliability, throughput, context, or SAQS claims require a new receipt from the exact pinned runtime. The existing 2/2 receipt supplied no tools.
Freeze checks
- Confirm
LAUNCH_GATE.mdP0 items and run all tests. - Confirm the standard and complete FP8 manifest digests.
- Record the operator host-quiescence attestation and stale-lock inspection.
- Apply the time-scoped Hub deletion plan while preserving
.gitattributes. - Keep the Hub and GitHub cards aligned and confirm
hero_ctaremains null. - List the pack as Preview and monitor install issues without changing claim class.
Independent personal pack. Verification is not gate clearance.