wo_id
stringlengths
12
12
disco
stringclasses
10 values
substation_id
stringclasses
23 values
category
stringclasses
2 values
created_time
stringdate
2024-01-01 00:11:38
2024-12-30 23:58:21
planned_start
stringdate
2024-01-01 00:55:49
2025-01-13 19:10:02
planned_end
stringdate
2024-01-01 00:55:49
2025-01-19 02:10:43
status
stringclasses
5 values
estimated_cost_ngn
float64
200k
32.9M
assigned_team
stringlengths
9
9
WO-000000000
Kaduna
KAD-SS-002
planned
2024-02-05 08:27:07
2024-02-12 08:27:07
2024-02-16 08:27:07
in_progress
3,549,301
TEAM-0000
WO-000000001
Enugu
ENG-SS-001
planned
2024-12-22 12:52:14
2025-01-02 12:52:14
2025-01-03 12:52:14
on_hold
6,611,601
TEAM-0001
WO-000000002
Abuja
ABJ-SS-002
planned
2024-08-28 05:40:59
2024-09-01 05:40:59
2024-09-04 05:40:59
cancelled
2,060,159
TEAM-0002
WO-000000003
Ibadan
IBD-SS-001
unplanned
2024-02-18 00:40:50
2024-02-18 00:40:50
2024-02-18 00:40:50
in_progress
2,162,083
TEAM-0003
WO-000000004
Enugu
ENG-SS-002
planned
2024-02-22 01:53:19
2024-03-01 01:53:19
2024-03-03 01:53:19
on_hold
2,421,303
TEAM-0004
WO-000000005
Jos
JOS-SS-001
unplanned
2024-11-09 00:38:16
2024-11-13 00:38:16
2024-11-13 00:38:16
open
865,215
TEAM-0005
WO-000000006
Enugu
ENG-SS-002
planned
2024-09-14 15:47:52
2024-09-17 15:47:52
2024-09-17 15:47:52
on_hold
631,574
TEAM-0006
WO-000000007
Enugu
ENG-SS-001
planned
2024-03-08 00:51:16
2024-03-14 00:51:16
2024-03-16 00:51:16
open
3,542,829
TEAM-0007
WO-000000008
Ibadan
IBD-SS-001
unplanned
2024-08-22 21:49:01
2024-08-22 21:49:01
2024-08-22 21:49:01
completed
2,984,564
TEAM-0008
WO-000000009
Ikeja
IKJ-SS-003
unplanned
2024-12-17 11:19:35
2024-12-17 11:19:35
2024-12-17 11:19:35
completed
2,144,900
TEAM-0009
WO-000000010
Jos
JOS-SS-002
planned
2024-10-13 17:22:55
2024-10-16 17:22:55
2024-10-21 17:22:55
open
625,941
TEAM-0010
WO-000000011
Kano
KNO-SS-001
planned
2024-11-29 15:15:41
2024-12-06 15:15:41
2024-12-07 15:15:41
in_progress
1,631,273
TEAM-0011
WO-000000012
Abuja
ABJ-SS-001
planned
2024-03-09 13:15:26
2024-03-20 13:15:26
2024-03-22 13:15:26
open
2,879,533
TEAM-0012
WO-000000013
Enugu
ENG-SS-002
unplanned
2024-02-10 12:11:52
2024-02-11 12:11:52
2024-02-11 12:11:52
open
3,909,927
TEAM-0013
WO-000000014
Ibadan
IBD-SS-003
unplanned
2024-02-01 20:39:01
2024-02-01 20:39:01
2024-02-01 20:39:01
completed
1,142,746
TEAM-0014
WO-000000015
Port Harcourt
PHC-SS-002
planned
2024-12-03 18:15:12
2024-12-04 18:15:12
2024-12-07 18:15:12
completed
3,608,537
TEAM-0015
WO-000000016
Jos
JOS-SS-001
unplanned
2024-02-08 15:59:29
2024-02-10 15:59:29
2024-02-10 15:59:29
cancelled
1,562,229
TEAM-0016
WO-000000017
Ikeja
IKJ-SS-001
unplanned
2024-02-20 15:15:07
2024-02-26 15:15:07
2024-02-29 15:15:07
completed
3,693,851
TEAM-0017
WO-000000018
Jos
JOS-SS-002
planned
2024-05-03 11:00:04
2024-05-05 11:00:04
2024-05-06 11:00:04
on_hold
2,877,271
TEAM-0018
WO-000000019
Eko
EKO-SS-002
unplanned
2024-12-21 05:22:04
2024-12-26 05:22:04
2024-12-27 05:22:04
open
601,247
TEAM-0019
WO-000000020
Jos
JOS-SS-002
planned
2024-03-21 10:32:47
2024-03-24 10:32:47
2024-03-26 10:32:47
in_progress
1,114,286
TEAM-0020
WO-000000021
Benin
BEN-SS-001
planned
2024-03-27 17:33:00
2024-04-03 17:33:00
2024-04-06 17:33:00
completed
1,579,501
TEAM-0021
WO-000000022
Benin
BEN-SS-002
planned
2024-04-09 16:36:18
2024-04-17 16:36:18
2024-04-21 16:36:18
completed
1,452,671
TEAM-0022
WO-000000023
Abuja
ABJ-SS-002
planned
2024-04-10 14:28:00
2024-04-11 14:28:00
2024-04-15 14:28:00
in_progress
1,943,660
TEAM-0023
WO-000000024
Enugu
ENG-SS-001
planned
2024-12-14 02:32:07
2024-12-19 02:32:07
2024-12-19 02:32:07
in_progress
2,963,568
TEAM-0024
WO-000000025
Benin
BEN-SS-001
unplanned
2024-01-31 07:16:40
2024-02-04 07:16:40
2024-02-06 07:16:40
in_progress
1,815,859
TEAM-0025
WO-000000026
Jos
JOS-SS-001
planned
2024-08-21 13:08:16
2024-08-29 13:08:16
2024-09-01 13:08:16
cancelled
1,719,035
TEAM-0026
WO-000000027
Abuja
ABJ-SS-003
planned
2024-01-07 11:03:00
2024-01-19 11:03:00
2024-01-24 11:03:00
open
1,055,464
TEAM-0027
WO-000000028
Ibadan
IBD-SS-002
unplanned
2024-02-08 04:31:49
2024-02-08 04:31:49
2024-02-10 04:31:49
in_progress
4,867,193
TEAM-0028
WO-000000029
Kaduna
KAD-SS-001
planned
2024-12-25 20:04:03
2025-01-04 20:04:03
2025-01-08 20:04:03
open
2,012,431
TEAM-0029
WO-000000030
Ibadan
IBD-SS-001
planned
2024-01-19 23:04:23
2024-01-25 23:04:23
2024-01-26 23:04:23
on_hold
2,867,966
TEAM-0030
WO-000000031
Eko
EKO-SS-002
unplanned
2024-05-30 06:26:49
2024-05-30 06:26:49
2024-05-30 06:26:49
in_progress
479,290
TEAM-0031
WO-000000032
Ikeja
IKJ-SS-002
planned
2024-06-19 13:29:04
2024-06-26 13:29:04
2024-06-28 13:29:04
completed
1,134,791
TEAM-0032
WO-000000033
Eko
EKO-SS-002
planned
2024-09-30 21:10:22
2024-10-07 21:10:22
2024-10-09 21:10:22
in_progress
7,415,844
TEAM-0033
WO-000000034
Abuja
ABJ-SS-002
planned
2024-07-22 18:05:31
2024-07-29 18:05:31
2024-07-31 18:05:31
open
876,683
TEAM-0034
WO-000000035
Eko
EKO-SS-001
unplanned
2024-07-22 11:06:34
2024-07-24 11:06:34
2024-07-24 11:06:34
on_hold
3,597,319
TEAM-0035
WO-000000036
Kano
KNO-SS-002
unplanned
2024-09-17 08:49:26
2024-09-19 08:49:26
2024-09-20 08:49:26
in_progress
3,491,787
TEAM-0036
WO-000000037
Ikeja
IKJ-SS-003
planned
2024-01-03 20:44:00
2024-01-11 20:44:00
2024-01-14 20:44:00
in_progress
1,605,141
TEAM-0037
WO-000000038
Ibadan
IBD-SS-001
unplanned
2024-05-11 04:11:11
2024-05-15 04:11:11
2024-05-15 04:11:11
completed
2,818,480
TEAM-0038
WO-000000039
Benin
BEN-SS-002
unplanned
2024-09-06 23:39:39
2024-09-06 23:39:39
2024-09-06 23:39:39
open
2,137,843
TEAM-0039
WO-000000040
Abuja
ABJ-SS-001
planned
2024-12-24 18:07:57
2024-12-29 18:07:57
2025-01-04 18:07:57
open
2,079,989
TEAM-0040
WO-000000041
Enugu
ENG-SS-002
planned
2024-10-26 13:22:09
2024-11-03 13:22:09
2024-11-03 13:22:09
in_progress
1,345,608
TEAM-0041
WO-000000042
Jos
JOS-SS-002
planned
2024-06-17 18:07:25
2024-06-25 18:07:25
2024-06-30 18:07:25
cancelled
3,198,464
TEAM-0042
WO-000000043
Kano
KNO-SS-002
planned
2024-05-10 07:31:44
2024-05-18 07:31:44
2024-05-21 07:31:44
on_hold
1,317,546
TEAM-0043
WO-000000044
Jos
JOS-SS-001
planned
2024-05-21 20:23:07
2024-05-26 20:23:07
2024-05-29 20:23:07
in_progress
1,511,776
TEAM-0044
WO-000000045
Jos
JOS-SS-002
planned
2024-08-02 12:47:00
2024-08-12 12:47:00
2024-08-16 12:47:00
in_progress
215,845
TEAM-0045
WO-000000046
Kano
KNO-SS-001
planned
2024-11-13 18:22:04
2024-11-15 18:22:04
2024-11-18 18:22:04
open
1,759,875
TEAM-0046
WO-000000047
Port Harcourt
PHC-SS-002
planned
2024-01-02 00:23:39
2024-01-09 00:23:39
2024-01-12 00:23:39
open
2,406,547
TEAM-0047
WO-000000048
Abuja
ABJ-SS-003
unplanned
2024-06-14 21:07:05
2024-06-17 21:07:05
2024-06-17 21:07:05
in_progress
1,063,032
TEAM-0048
WO-000000049
Eko
EKO-SS-002
unplanned
2024-04-07 11:26:57
2024-04-11 11:26:57
2024-04-13 11:26:57
in_progress
737,416
TEAM-0049
WO-000000050
Jos
JOS-SS-001
planned
2024-01-26 05:13:38
2024-02-05 05:13:38
2024-02-08 05:13:38
on_hold
829,118
TEAM-0050
WO-000000051
Enugu
ENG-SS-002
planned
2024-07-05 18:07:44
2024-07-13 18:07:44
2024-07-14 18:07:44
open
1,972,756
TEAM-0051
WO-000000052
Benin
BEN-SS-002
planned
2024-06-23 19:16:04
2024-07-01 19:16:04
2024-07-01 19:16:04
in_progress
2,868,142
TEAM-0052
WO-000000053
Ikeja
IKJ-SS-003
unplanned
2024-11-01 09:29:43
2024-11-04 09:29:43
2024-11-05 09:29:43
in_progress
1,039,124
TEAM-0053
WO-000000054
Enugu
ENG-SS-001
unplanned
2024-05-15 08:03:10
2024-05-16 08:03:10
2024-05-17 08:03:10
open
691,726
TEAM-0054
WO-000000055
Kano
KNO-SS-001
planned
2024-08-05 09:58:22
2024-08-14 09:58:22
2024-08-14 09:58:22
open
1,600,189
TEAM-0055
WO-000000056
Kano
KNO-SS-002
planned
2024-11-12 20:29:03
2024-11-17 20:29:03
2024-11-21 20:29:03
in_progress
1,666,573
TEAM-0056
WO-000000057
Abuja
ABJ-SS-002
unplanned
2024-12-10 20:40:43
2024-12-10 20:40:43
2024-12-11 20:40:43
open
1,087,542
TEAM-0057
WO-000000058
Ikeja
IKJ-SS-002
planned
2024-08-12 20:41:30
2024-08-16 20:41:30
2024-08-19 20:41:30
in_progress
5,839,536
TEAM-0058
WO-000000059
Ikeja
IKJ-SS-002
planned
2024-04-29 10:41:17
2024-05-05 10:41:17
2024-05-06 10:41:17
in_progress
5,981,933
TEAM-0059
WO-000000060
Jos
JOS-SS-001
planned
2024-06-13 03:52:51
2024-06-19 03:52:51
2024-06-24 03:52:51
completed
2,604,128
TEAM-0060
WO-000000061
Enugu
ENG-SS-002
unplanned
2024-01-16 00:44:04
2024-01-17 00:44:04
2024-01-17 00:44:04
completed
1,954,044
TEAM-0061
WO-000000062
Kaduna
KAD-SS-002
planned
2024-02-01 15:08:45
2024-02-05 15:08:45
2024-02-07 15:08:45
completed
928,664
TEAM-0062
WO-000000063
Kaduna
KAD-SS-002
planned
2024-11-25 18:39:25
2024-12-03 18:39:25
2024-12-06 18:39:25
on_hold
1,043,271
TEAM-0063
WO-000000064
Port Harcourt
PHC-SS-001
unplanned
2024-10-05 16:22:52
2024-10-05 16:22:52
2024-10-05 16:22:52
in_progress
3,136,428
TEAM-0064
WO-000000065
Eko
EKO-SS-002
planned
2024-02-28 07:51:07
2024-03-03 07:51:07
2024-03-06 07:51:07
in_progress
2,669,465
TEAM-0065
WO-000000066
Kano
KNO-SS-001
unplanned
2024-09-21 19:25:13
2024-09-21 19:25:13
2024-09-21 19:25:13
completed
2,652,501
TEAM-0066
WO-000000067
Port Harcourt
PHC-SS-002
planned
2024-05-31 11:27:51
2024-06-09 11:27:51
2024-06-12 11:27:51
completed
1,487,728
TEAM-0067
WO-000000068
Kaduna
KAD-SS-001
planned
2024-10-13 11:29:25
2024-10-25 11:29:25
2024-10-26 11:29:25
in_progress
1,679,635
TEAM-0068
WO-000000069
Eko
EKO-SS-001
planned
2024-06-19 10:14:14
2024-06-27 10:14:14
2024-07-02 10:14:14
in_progress
1,511,465
TEAM-0069
WO-000000070
Port Harcourt
PHC-SS-002
planned
2024-11-16 12:41:40
2024-11-22 12:41:40
2024-11-25 12:41:40
open
3,109,218
TEAM-0070
WO-000000071
Abuja
ABJ-SS-002
unplanned
2024-05-06 13:28:56
2024-05-08 13:28:56
2024-05-11 13:28:56
open
2,081,031
TEAM-0071
WO-000000072
Ikeja
IKJ-SS-002
unplanned
2024-04-03 08:51:50
2024-04-09 08:51:50
2024-04-09 08:51:50
completed
1,777,446
TEAM-0072
WO-000000073
Jos
JOS-SS-001
unplanned
2024-07-15 08:49:59
2024-07-15 08:49:59
2024-07-15 08:49:59
completed
855,119
TEAM-0073
WO-000000074
Kano
KNO-SS-002
planned
2024-01-16 22:54:32
2024-01-31 22:54:32
2024-02-02 22:54:32
completed
1,058,957
TEAM-0074
WO-000000075
Abuja
ABJ-SS-001
planned
2024-07-08 01:02:49
2024-07-15 01:02:49
2024-07-19 01:02:49
in_progress
1,839,640
TEAM-0075
WO-000000076
Ikeja
IKJ-SS-003
planned
2024-05-25 13:51:33
2024-06-02 13:51:33
2024-06-02 13:51:33
open
2,674,387
TEAM-0076
WO-000000077
Benin
BEN-SS-001
unplanned
2024-12-27 05:06:24
2024-12-27 05:06:24
2024-12-27 05:06:24
completed
1,893,500
TEAM-0077
WO-000000078
Ibadan
IBD-SS-002
planned
2024-12-06 14:04:50
2024-12-17 14:04:50
2024-12-17 14:04:50
completed
1,355,835
TEAM-0078
WO-000000079
Port Harcourt
PHC-SS-001
planned
2024-12-07 19:37:36
2024-12-13 19:37:36
2024-12-17 19:37:36
completed
1,529,448
TEAM-0079
WO-000000080
Benin
BEN-SS-001
unplanned
2024-10-02 17:32:12
2024-10-06 17:32:12
2024-10-06 17:32:12
open
3,356,707
TEAM-0080
WO-000000081
Port Harcourt
PHC-SS-001
planned
2024-07-04 13:40:00
2024-07-09 13:40:00
2024-07-15 13:40:00
in_progress
2,216,600
TEAM-0081
WO-000000082
Abuja
ABJ-SS-003
planned
2024-07-05 15:51:44
2024-07-12 15:51:44
2024-07-12 15:51:44
in_progress
1,752,863
TEAM-0082
WO-000000083
Benin
BEN-SS-001
unplanned
2024-05-14 04:49:38
2024-05-18 04:49:38
2024-05-21 04:49:38
in_progress
1,541,794
TEAM-0083
WO-000000084
Kano
KNO-SS-002
planned
2024-05-29 07:17:43
2024-06-10 07:17:43
2024-06-13 07:17:43
completed
1,563,246
TEAM-0084
WO-000000085
Enugu
ENG-SS-001
unplanned
2024-08-17 20:34:36
2024-08-17 20:34:36
2024-08-17 20:34:36
completed
1,826,140
TEAM-0085
WO-000000086
Kano
KNO-SS-002
unplanned
2024-03-06 00:16:17
2024-03-08 00:16:17
2024-03-09 00:16:17
open
2,530,978
TEAM-0086
WO-000000087
Benin
BEN-SS-002
planned
2024-06-17 14:36:43
2024-06-18 14:36:43
2024-06-20 14:36:43
in_progress
2,415,185
TEAM-0087
WO-000000088
Eko
EKO-SS-001
planned
2024-07-27 15:36:16
2024-07-31 15:36:16
2024-08-02 15:36:16
completed
3,403,284
TEAM-0088
WO-000000089
Ikeja
IKJ-SS-001
planned
2024-08-03 08:38:36
2024-08-05 08:38:36
2024-08-08 08:38:36
open
5,408,917
TEAM-0089
WO-000000090
Kano
KNO-SS-002
planned
2024-08-06 16:10:47
2024-08-06 16:10:47
2024-08-10 16:10:47
open
1,538,376
TEAM-0090
WO-000000091
Jos
JOS-SS-001
unplanned
2024-12-07 12:10:53
2024-12-09 12:10:53
2024-12-09 12:10:53
completed
3,892,533
TEAM-0091
WO-000000092
Jos
JOS-SS-002
planned
2024-05-16 06:56:07
2024-05-23 06:56:07
2024-05-24 06:56:07
open
3,042,337
TEAM-0092
WO-000000093
Enugu
ENG-SS-001
planned
2024-11-16 03:19:54
2024-11-23 03:19:54
2024-11-27 03:19:54
open
1,612,557
TEAM-0093
WO-000000094
Enugu
ENG-SS-002
unplanned
2024-01-08 19:27:09
2024-01-08 19:27:09
2024-01-08 19:27:09
open
962,345
TEAM-0094
WO-000000095
Port Harcourt
PHC-SS-001
planned
2024-04-28 09:04:30
2024-05-04 09:04:30
2024-05-06 09:04:30
in_progress
1,396,415
TEAM-0095
WO-000000096
Abuja
ABJ-SS-003
planned
2024-01-06 08:38:50
2024-01-08 08:38:50
2024-01-09 08:38:50
completed
1,927,046
TEAM-0096
WO-000000097
Kano
KNO-SS-001
planned
2024-01-03 08:35:16
2024-01-10 08:35:16
2024-01-15 08:35:16
on_hold
2,362,806
TEAM-0097
WO-000000098
Port Harcourt
PHC-SS-002
unplanned
2024-07-11 01:37:33
2024-07-12 01:37:33
2024-07-13 01:37:33
in_progress
1,015,116
TEAM-0098
WO-000000099
Kano
KNO-SS-002
planned
2024-11-20 16:38:26
2024-11-26 16:38:26
2024-11-27 16:38:26
in_progress
1,871,811
TEAM-0099
End of preview. Expand in Data Studio

Nigerian Energy & Utilities – Work Orders | Africa (Electric Sheep Africa metadata inventory)

Size category: 10K<n<100K - Formats: parquet - Sector: energy - Engineered by Electric Sheep Africa

size sector downloads license

TL;DR

This dataset is part of the Electric Sheep Africa catalog on Hugging Face. It is indexed for African data discovery with standardized metadata, loading guidance, provenance notes, and analyst-oriented context.

What This Dataset Covers

Public datasets help analysts inspect structured evidence, build reproducible workflows, and compare patterns across domains.

Dataset context from the existing Hugging Face card: # Nigerian Energy & Utilities – Work Orders Planned/unplanned work orders with timelines, status, costs, and assigned teams. - [category] Maintenance & Operations - [rows] ~80,000 - [formats] CSV + Parquet (snappy) - [geography] Nigeria (DisCos, substations, plants) ## Schema | column | dtype | |---|---| | wo_id | object | | disco | object | | substation_id | object | | category | object | | created_time | object | | planned_start | object | | planned_end | object | |… See the full description on the dataset page: https://huggingface.co/datasets/electricsheepafrica/nigerian_energy_and_utilities_work_orders.

Dataset Profile

Field Value
Hugging Face repo electricsheepafrica/nigerian_energy_and_utilities_work_orders
Sector energy
Topic tags nigeria, energy, utilities, power, grid, smart-meter, renewables
Modalities text
Formats parquet
Size category 10K<n<100K
Countries Nigeria
ISO3 coverage NGA
Last modified on HF 2025-10-11 18:13:38+00:00
Inventory snapshot 2026-07-16T16:00:34Z

How To Read This Dataset

  • Start from the repository files and the dataset viewer when available.
  • Treat the README context as a fast orientation layer; confirm variable definitions and units in the data files before modeling.
  • Use explicit country columns when present. When geography is only implied by the title or source metadata, document that assumption in downstream analysis.
  • Preserve missing values until you have a defensible imputation rule.

Usage

from datasets import load_dataset

ds = load_dataset("electricsheepafrica/nigerian_energy_and_utilities_work_orders")
print(ds)

split_name = next(iter(ds))
table = ds[split_name]
print(table.features)
print(table[:3])

Convert To Pandas When Tabular

from datasets import Dataset

first_split = ds[next(iter(ds))]
if isinstance(first_split, Dataset):
    df = first_split.to_pandas()
    print(df.head())

Data Quality Notes

  • This card was standardized from the Electric Sheep Africa Hugging Face metadata inventory.
  • Exact schema, row counts, and source files should be inspected in the repository data files.
  • Metadata gaps from the inventory: upstream_publisher.
  • Do not infer policy meaning from labels alone; confirm definitions, units, and methods in the source material.

Source And Provenance

Suggested Analyses

  • Inspect schema and missingness before modeling.
  • Profile variables by geography, time, and subgroup columns where present.
  • Join with other Electric Sheep Africa datasets using explicit country, year, and indicator fields when available.
  • Build reproducible notebooks that cite both the original source context and the Electric Sheep Africa Hugging Face repo.

Citation

@misc{electric_sheep_africa_nigerian_energy_and_utilities_work_orders_2026,
  title        = {Nigerian Energy & Utilities – Work Orders | Africa (Electric Sheep Africa metadata inventory)},
  author       = {Public dataset metadata},
  year         = {2026},
  url          = {https://huggingface.co/datasets/electricsheepafrica/nigerian_energy_and_utilities_work_orders},
  publisher    = {Hugging Face Datasets, engineered by Electric Sheep Africa},
  howpublished = {\url{https://huggingface.co/datasets/electricsheepafrica/nigerian_energy_and_utilities_work_orders}}
}

License

Released under gpl.

Original source rights remain with the original publisher or data provider. Electric Sheep Africa engineering standardizes discovery metadata, documentation, and usage guidance for analysis on Hugging Face.

About Electric Sheep Africa

Electric Sheep Africa publishes ML-ready African public datasets on Hugging Face.


Provenance: metadata-backed README standardized 2026-08-12 by the Electric Sheep Africa README system. Inventory source: catalog/esa_metadata_inventory/master_metadata.jsonl.

Downloads last month
40

Collections including electricsheepafrica/nigerian_energy_and_utilities_work_orders