Dataset Viewer
Auto-converted to Parquet Duplicate
source_record_id
stringlengths
38
42
country_iso3
stringclasses
1 value
country_name
stringclasses
1 value
id
int64
1
15.1k
hhid
float64
300k
315k
clust
float64
10k
11.7k
province
stringclasses
5 values
district
stringclasses
30 values
ur
stringclasses
2 values
s5aq1
stringclasses
5 values
s5aq2
stringclasses
6 values
s5aq3
int64
1
13
s5aq4y
int64
0
87
s5aq4m
int64
0
11
s5aq5
bool
2 classes
s5aq6
stringclasses
10 values
s5aq7
stringclasses
9 values
s5aq8
stringclasses
6 values
s5bq1
float64
15k
500M
s5bq2a
float64
200
5M
s5bq2b
stringclasses
3 values
s5bq3a
float64
0
1.2M
s5bq3b
stringclasses
3 values
s5bq4
stringclasses
2 values
s5bq5a
float64
1k
50k
s5bq5b
stringclasses
2 values
s5bq6
stringclasses
2 values
s5bq7
float64
1.95k
2.02k
s5bq8
float64
1k
200M
s5bq9
stringclasses
6 values
s5cq1
stringclasses
14 values
s5cq2a
float64
1
8k
s5cq2b
float64
1
300
s5cq3
stringclasses
15 values
s5cq4b
float64
1
240
s5cq5
stringclasses
2 values
s5cq6a
stringclasses
8 values
s5cq6b
float64
0
10k
s5cq7
stringclasses
7 values
s5cq8
stringclasses
3 values
s5cq9a
float64
0
12
s5cq9b
float64
0
88k
s5cq10
bool
2 classes
s5cq11
float64
10
25k
s5cq12
int64
0
26.5k
s5cq13
stringclasses
5 values
s5cq14
stringclasses
4 values
s5cq15
stringclasses
7 values
s5cq16
stringclasses
15 values
s5cq17
stringclasses
6 values
s5cq18
stringclasses
2 values
s5cq19
stringclasses
2 values
s5cq20
float64
0
200k
s5cq20a
bool
2 classes
s5cq20b
stringclasses
5 values
s5cq20c
stringclasses
7 values
s5cq21
stringclasses
10 values
s5cq22a
stringclasses
12 values
s5cq22b
stringclasses
13 values
s5cq22c
stringclasses
13 values
s5cq23
stringclasses
6 values
s5cq24
stringclasses
7 values
s5cq25
stringclasses
9 values
s5cq26
stringclasses
2 values
s5cq27
float64
1
20
s5cq28
stringclasses
3 values
s5cq29
stringclasses
2 values
s5cq30
stringclasses
5 values
s5cq31
bool
2 classes
s5cq32
stringclasses
5 values
s5cq33
bool
2 classes
s5cq34
stringclasses
5 values
s5dq1
stringclasses
12 values
s5dq2
stringclasses
6 values
s5dq3
stringclasses
7 values
s5dq4
float64
4
360
s5eq1
bool
2 classes
s5eq2a
stringclasses
18 values
s5eq2b
stringclasses
18 values
s5eq2c
stringclasses
16 values
s5eq2aa_m
float64
1
12
s5eq2ab_m
float64
1
12
s5eq2ac_m
float64
2
5
s5eq2aa_y
float64
2.02k
2.02k
s5eq2ab_y
float64
2.02k
2.02k
s5eq2ac_y
float64
2.02k
2.02k
s5eq3a
stringclasses
22 values
s5eq3b
stringclasses
20 values
s5eq3c
stringclasses
16 values
s5eq4a
stringclasses
13 values
s5eq4b
stringclasses
13 values
s5eq4c
stringclasses
10 values
s7aq4
stringclasses
2 values
s7aq4a
float64
0
1k
s7aq4b
float64
0
120
s7aq4c
float64
0
30
s7aq4d
float64
0
40
s7aq4e
float64
0
270
s7aq4f
float64
0
10
s7a2q1
bool
2 classes
s7a2q2
float64
2.01k
2.02k
s7a2q3
stringclasses
2 values
s7a2q4
bool
2 classes
s7a2q5a
float64
1
56
s7a2q6a
stringclasses
3 values
s7a2q6b
stringclasses
3 values
s7a2q6c
stringclasses
3 values
s7a2q7
stringclasses
3 values
quintile
stringclasses
5 values
s5cq4a
float64
0
2.91k
strata_id
int64
111
572
weight
float64
48.8
627
pop_wt
float64
67.9
5.29k
epov_jan
stringclasses
2 values
pov_jan
stringclasses
2 values
poverty
stringclasses
3 values
source_provider
stringclasses
1 value
source_dataset
stringclasses
1 value
source_resource
stringclasses
1 value
source_package_id
stringclasses
1 value
source_resource_id
stringclasses
1 value
source_url
stringclasses
1 value
license_id
stringclasses
1 value
retrieved_at
stringdate
2026-07-18 11:48:51
2026-07-18 11:48:51
40ea7a58-fde4-4045-b088-a7c85b4fd948:0
RWA
Rwanda
1
300,001
10,001
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by multiple Households
2
0
2
true
Get a better house
Non relative
Tenancy (renting)
null
null
null
150,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
Yes, at least once
1
2,010
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
3,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In a separate dwelling
Rubbish collection Service
Ventilated improved pit (VIP) latrine
False
null
Don?t know
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Clay tiles
48
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
170.958195
1,025.7491
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:1
RWA
Rwanda
2
300,002
10,001
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
5
0
true
Renting cost
Relative
Dwelling provided free of charge
null
30,000
Month
null
null
null
null
null
False
null
null
null
Public tap/standpipe
30
12
Public tap/standpipe
12
True
null
null
null
No, always sufficient
null
null
true
300
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
false
null
Cost of the serviceis too high
Cooking gas stove
Gas
No second fuel
null
In dwelling, in a sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
3
Never emptied
null
null
true
Heavy Wind
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
8.75
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
30
111
170.958195
170.95819
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:2
RWA
Rwanda
3
300,003
10,001
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by multiple Households
1
1
6
true
Access to new/different job
Non relative
Tenancy (renting)
null
null
null
35,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
Yes, at least once
0
0
true
1,000
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
3,000
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Ventilated improved pit (VIP) latrine
True
1
Never emptied
null
null
false
null
true
Meetings/trainings
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
12.99
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
1
0
0
0
0
0
false
null
null
false
null
null
null
null
No, other place
Q5
0
111
170.958195
170.95819
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:3
RWA
Rwanda
4
300,004
10,001
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
3
5
2
true
Move to a better neighbourhood
Non relative
Tenancy (renting)
null
null
null
60,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
2
6,500
true
1,000
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
2,500
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Ventilated improved pit (VIP) latrine
True
1
Never emptied
null
null
true
Heavy rain
true
Radio/TV
Oven fired bricks with cement
Metal sheets/corrugated iron
Cement
28
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
170.958195
683.83276
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:4
RWA
Rwanda
5
300,005
10,001
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by one household
2
7
6
true
Renting cost
Relative
Dwelling provided free of charge
null
40,000
Month
null
null
null
null
null
False
null
null
null
Public tap/standpipe
100
5
Public tap/standpipe
5
True
null
null
null
No, always sufficient
null
null
true
840
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
500
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
True
1
Never emptied
null
null
true
Heavy Wind
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
44
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Sold household goods (radio, furniture, refrigerator, television, jewellery)
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q3
100
111
170.958195
683.83276
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:5
RWA
Rwanda
6
300,006
10,001
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by one household
2
27
0
true
Build/buy own house
Spouse with head
Owner occupied
8,000,000
60,000
Month
null
null
null
null
null
null
1,996
400,000
Bought
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
1,200
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
2,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
50
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q4
0
111
170.958195
854.79095
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:6
RWA
Rwanda
7
300,007
10,001
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
2
2
0
false
null
Head
Owner occupied
4,000,000
60,000
Month
null
null
null
null
null
null
2,021
2,500,000
Inherited from parents
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
2
2,000
true
30
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
false
null
false
null
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
35
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
170.958195
170.95819
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:7
RWA
Rwanda
8
300,008
10,001
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
2
0
true
Get a better house
Relative
Temporary settlement
null
30,000
Month
null
null
null
null
null
False
null
null
null
Public tap/standpipe
300
10
Public tap/standpipe
10
True
null
null
null
Yes, at least once
null
null
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
2,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
4
Never emptied
null
null
false
null
true
Meetings/trainings
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
40
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Reduced expenditure on food
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q4
300
111
170.958195
1,025.7491
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:8
RWA
Rwanda
9
300,009
10,001
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
1
3
true
Access to new/different job
Non relative
Tenancy (renting)
null
null
null
18,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
100
5
Public tap/standpipe
5
True
null
null
null
Yes, at least once
null
null
true
350
0
Rainwater tank from roof
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
0
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
false
null
false
null
Mud bricks with cement
Metal sheets/corrugated iron
Cement
7.5
true
Serious illness or accident of household member
No other shock
null
null
null
null
null
null
null
Sold household goods (radio, furniture, refrigerator, television, jewellery)
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q2
100
111
170.958195
170.95819
Non Extreme Poor
1.0
Moderately poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:9
RWA
Rwanda
10
300,010
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
Several buildings in a compound occupied by several households
1
0
2
false
null
Non relative
Tenancy (renting)
null
null
null
70,000
Month
False
null
null
True
2,014
20,000,000
Inherited from parents
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
Yes, at least once
1
3,500
true
1,000
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
5,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In dwelling, not in sleeping area
Rubbish collection Service
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Clay tiles
54
true
Breakup of household
No other shock
null
null
null
null
null
null
null
Received help from family and/or friends
null
null
2.0
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
185.533417
556.6003
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:10
RWA
Rwanda
11
300,011
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by one household
5
7
10
true
Build/buy own house
Spouse with head
Owner occupied
70,000,000
300,000
Month
null
null
null
null
null
null
2,015
37,000,000
Bought
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
1
12,000
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
20,000
true
Wireless
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In a separate dwelling
Rubbish collection Service
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Cement blocks
Metal sheets/corrugated iron
Clay tiles
110
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
0
0
0
0
7
0
false
null
null
false
null
null
null
null
No, other place
Q5
0
111
185.533417
1,484.2673
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:11
RWA
Rwanda
12
300,012
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
Multi-storied building occupied by one household
5
3
2
true
Build/buy own house
Spouse with head
Owner occupied
100,000,000
350,000
Month
null
null
null
null
null
null
2,020
80,000,000
Constructed
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
1
17,500
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
25,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In a separate dwelling
Rubbish collection Service
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Oven fired bricks with mud
Metal sheets/corrugated iron
Clay tiles
100
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
185.533417
1,298.7339
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:12
RWA
Rwanda
13
300,013
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by one household
4
2
10
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
200,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
1
5,500
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
4,000
true
Mobile phone
null
Self-built solid fuel stove
Charcoal.
No second fuel
null
In a separate dwelling
Rubbish collection Service
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Cement blocks
Metal sheets/corrugated iron
Clay tiles
91.25
true
Failure of a non-agricultural household business
No other shock
null
null
null
null
null
null
null
Worked longer hours and/or worked more
null
null
HH not recoverd from the shock
null
null
True
1
0
0
0
0
0
false
null
null
false
null
null
null
null
No, other place
Q5
0
111
185.533417
927.6671
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:13
RWA
Rwanda
14
300,014
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by multiple Households
4
19
2
false
null
Head
Owner occupied
35,000,000
120,000
Month
null
null
null
null
null
null
2,004
6,000,000
Bought
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
6,000
true
1,000
0
Rainwater tank from roof
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
2,000
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
True
4
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
78.5
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
3
0
0
0
0
10
false
null
null
false
null
null
null
null
null
Q4
0
111
185.533417
1,484.2673
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:14
RWA
Rwanda
15
300,015
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by multiple Households
1
0
1
true
Get a better house
Non relative
Tenancy (renting)
null
null
null
15,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
0
0
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
0
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
6
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
12.9
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Used up savings)
null
null
HH not recoverd from the shock
null
null
True
0
0
0
2
0
0
false
null
null
false
null
null
null
null
No, other place
Q5
0
111
185.533417
185.53342
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:15
RWA
Rwanda
16
300,016
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by one household
4
11
1
false
null
Head
Owner occupied
10,000,000
80,000
Month
null
null
null
null
null
null
2,011
6,000,000
Constructed
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
5,118
true
500
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
8,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
52.63
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Reduced expenditure on food
null
null
HH not recoverd from the shock
null
null
True
0
0
0
0
5
0
false
null
null
false
null
null
null
null
No, other place
Q5
0
111
185.533417
1,113.2006
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:16
RWA
Rwanda
17
300,017
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by one household
1
0
8
true
Get a better house
Non relative
Tenancy (renting)
null
null
null
20,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
0
0
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
0
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In a veranda (roofed platform with at least two open sides)
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
True
3
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
21.45
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Reduced expenditure on food
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
185.533417
185.53342
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:17
RWA
Rwanda
18
300,018
10,002
City of Kigali
Nyarugenge
Urban
Modern planned urban area
Several buildings in a compound occupied by one household
1
1
2
true
Move to a better neighbourhood
Non relative
Tenancy (renting)
null
null
null
50,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
2,000
true
1,000
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
2,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Clay tiles
21
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
185.533417
371.06683
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:18
RWA
Rwanda
19
300,019
10,003
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by multiple Households
3
5
0
true
Build/buy own house
Head
Owner occupied
10,000,000
150,000
Month
null
null
null
null
null
null
2,017
4,500,000
Bought
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
5,900
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
3,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
Gas
No third fuel
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
True
1
Never emptied
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Clay tiles
59.5
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
147.645975
442.93793
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:19
RWA
Rwanda
20
300,020
10,003
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by one household
4
13
10
true
Build/buy own house
Head
Owner occupied
15,000,000
150,000
Month
null
null
null
null
null
null
2,002
800,000
Bought
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
1,210
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
2,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In dwelling, not in sleeping area
Rubbish collection Service
Ventilated improved pit (VIP) latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
54.2
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
147.645975
738.22986
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:20
RWA
Rwanda
21
300,021
10,003
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by multiple Households
2
0
8
true
Move to a better neighbourhood
Non relative
Tenancy (renting)
null
null
null
50,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
1
4,200
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
2,000
true
Mobile phone
null
Cooking gas stove
Gas
Firewood
No third fuel
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
True
4
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
42
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Worked longer hours and/or worked more
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
147.645975
590.5839
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:21
RWA
Rwanda
22
300,022
10,003
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by one household
1
0
1
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
40,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
1
1,000
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In dwelling, not in sleeping area
Compost heap on own property
Pit Latrine with constructed floor slab
True
1
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
23.16
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
147.645975
147.64598
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:22
RWA
Rwanda
23
300,023
10,003
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by one household
4
23
0
true
Build/buy own house
Head
Owner occupied
10,000,000
100,000
Month
null
null
null
null
null
null
2,000
3,000,000
Constructed
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
1
2,000
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
4,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
96
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
147.645975
1,181.1678
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:23
RWA
Rwanda
24
300,024
10,003
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by multiple Households
2
0
4
true
Access to new/different job
Non relative
Tenancy (renting)
null
null
null
80,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
1
5,000
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
4,000
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Flush to pit latrine
False
null
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
21.8
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
147.645975
147.64598
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:24
RWA
Rwanda
25
300,025
10,003
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
2
3
0
true
Move to a better neighbourhood
Non relative
Tenancy (renting)
null
null
null
50,000
Month
False
null
null
False
null
null
null
Piped to neighbor HH
300
30
Bottled water
null
null
Piped to neighbor HH3
300
Not safe
Yes, at least once
null
null
true
2,000
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
4,500
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In dwelling, in a sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
5
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
36.72
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
147.645975
590.5839
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:25
RWA
Rwanda
26
300,026
10,003
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by multiple Households
3
37
2
false
null
Head
Owner occupied
10,000,000
100,000
Month
null
null
null
null
null
null
1,986
7,000,000
Inherited from parents
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
1
1,200
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
5,000
true
Landline/Cable Internet
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Ventilated improved pit (VIP) latrine
True
1
Never emptied
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
40
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
147.645975
295.29196
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:26
RWA
Rwanda
27
300,027
10,004
City of Kigali
Nyarugenge
Rural
Umudugudu (Planned rural settlement)
House occupied by one household
1
6
2
true
Renting cost
Relative
Dwelling provided free of charge
null
30,000
Month
null
null
null
null
null
False
null
null
null
Public tap/standpipe
2,500
60
Public tap/standpipe
60
True
null
null
null
No, always sufficient
null
null
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
2,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
Firewood
No third fuel
In a separate dwelling
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
True
1
Never emptied
null
null
false
null
true
Meetings/trainings
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
32
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
0
0
0
0
4
0
false
null
null
false
null
null
null
null
No, other place
Q5
2,500
112
112.270137
336.81042
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:27
RWA
Rwanda
28
300,028
10,004
City of Kigali
Nyarugenge
Rural
Umudugudu (Planned rural settlement)
House occupied by one household
3
10
0
true
Get a better house
Spouse with head
Owner occupied
8,000,000
30,000
Month
null
null
null
null
null
null
2,013
5,000,000
Bartered
Public tap/standpipe
1,666
40
Public tap/standpipe
40
True
null
null
null
No, always sufficient
null
null
false
null
0
No measures
No
Application pending
Torch (rechargeable or not)/Phone flashligh
null
null
null
null
false
null
Cost of the serviceis too high
Three stone/Traditional stove
Firewood
No second fuel
null
In a separate dwelling
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Meetings/trainings
Cement blocks
Metal sheets/corrugated iron
Cement
42
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q1
1,666
112
112.270137
673.62085
Non Extreme Poor
1.0
Moderately poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:28
RWA
Rwanda
29
300,029
10,004
City of Kigali
Nyarugenge
Rural
Modern planned urban area
House occupied by one household
3
4
5
true
Move to a better neighbourhood
Spouse with head
Owner occupied
1,000,000
40,000
Month
null
null
null
null
null
null
2,018
3,000,000
Constructed
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
2
9,676
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,200
false
null
Cost of the serviceis too high
Charcoal/fire stove
Firewood
No second fuel
null
In a separate dwelling
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
77
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
0
0
0
0
10
0
false
null
null
false
null
null
null
null
No, other place
Q4
0
112
112.270137
561.3507
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:29
RWA
Rwanda
30
300,030
10,004
City of Kigali
Nyarugenge
Rural
Umudugudu (Planned rural settlement)
House occupied by multiple Households
2
1
6
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
8,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
100
5
Public tap/standpipe
5
True
null
null
null
Yes, at least once
null
null
true
20
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
false
null
Cost of the serviceis too high
Three stone/Traditional stove
Firewood
Straw/shrub/grass (udushari).
No third fuel
Outdoors
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Beaten earth
20.14
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Reduced expenditure on food
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q1
100
112
112.270137
336.81042
Non Extreme Poor
1.0
Moderately poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:30
RWA
Rwanda
31
300,031
10,004
City of Kigali
Nyarugenge
Rural
Modern planned urban area
House occupied by one household
3
5
2
false
null
Spouse with head
Owner occupied
50,000,000
100,000
Month
null
null
null
null
null
null
2,018
30,000,000
Constructed
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
Yes, at least once
1
10,500
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
15,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In a separate dwelling
Compost heap on own property
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Social Media
Cement blocks
Metal sheets/corrugated iron
Clay tiles
130
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
1
0
0
0
0
0
false
null
null
false
null
null
null
null
No, other place
Q5
0
112
112.270137
561.3507
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:31
RWA
Rwanda
32
300,032
10,004
City of Kigali
Nyarugenge
Rural
Umudugudu (Planned rural settlement)
House occupied by one household
3
46
2
false
null
Head
Owner occupied
12,000,000
10,000
Month
null
null
null
null
null
null
2,009
5,000,000
Received as gift
Public tap/standpipe
85
3
Public tap/standpipe
3
True
null
null
null
No, always sufficient
null
null
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
false
null
Cost of the serviceis too high
Three stone/Traditional stove
Firewood
No second fuel
null
Outdoors
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Cement blocks
Metal sheets/corrugated iron
Cement
40.8
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
true
2,018
False
false
null
Yes, reduced
null
null
No, other place
Q3
85
112
112.270137
336.81042
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:32
RWA
Rwanda
33
300,033
10,004
City of Kigali
Nyarugenge
Rural
Umudugudu (Planned rural settlement)
House occupied by multiple Households
2
3
1
true
Resettlement- policy
Head
Owner occupied
6,000,000
20,000
Month
null
null
null
null
null
null
2,020
4,000,000
Received as gift
Public tap/standpipe
80
3
Public tap/standpipe
3
True
null
null
null
No, always sufficient
null
null
false
null
0
Rainwater tank from roof
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,500
false
null
Don?t know the Internet.
Charcoal/fire stove
Charcoal.
No second fuel
null
In a separate dwelling
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Oven fired bricks with mud
Metal sheets/corrugated iron
Cement
42
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
80
112
112.270137
336.81042
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:33
RWA
Rwanda
34
300,034
10,004
City of Kigali
Nyarugenge
Rural
Modern planned urban area
House occupied by one household
3
8
0
true
Build/buy own house
Spouse with head
Owner occupied
30,000,000
200,000
Month
null
null
null
null
null
null
2,014
20,000,000
Constructed
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
9
53,000
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
20,000
true
Wireless
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, not in sleeping area
Thrown in the household?s fields or bushes
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Clay tiles
45.2
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
112
112.270137
449.08054
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:34
RWA
Rwanda
35
300,035
10,004
City of Kigali
Nyarugenge
Rural
Umudugudu (Planned rural settlement)
House occupied by one household
2
1
0
true
Build/buy own house
Spouse with head
Owner occupied
15,000,000
50,000
Month
null
null
null
null
null
null
2,016
3,000,000
Bought
Public tap/standpipe
500
15
Public tap/standpipe
15
True
null
null
null
No, always sufficient
null
null
true
420
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
3,000
false
null
Don?t know the Internet.
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
false
null
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
29.9
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
1
2
0
0
0
0
false
null
null
false
null
null
null
null
No, other place
Q5
500
112
112.270137
336.81042
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:35
RWA
Rwanda
36
300,036
10,005
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by one household
4
2
6
true
Get a better house
Non relative
Tenancy (renting)
null
null
null
150,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
800
true
1,000
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,500
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In a separate dwelling
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
99
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
180.366784
541.10034
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:36
RWA
Rwanda
37
300,037
10,005
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
Several buildings in a compound occupied by several households
2
23
2
true
Build/buy own house
Head
Owner occupied
8,000,000
40,000
Month
null
null
null
null
null
null
2,000
3,000,000
Constructed
Public tap/standpipe
420
13
Public tap/standpipe
13
True
null
null
null
Yes, at least once
null
null
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
2,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
false
null
true
Meetings/trainings
Mud bricks with cement
Metal sheets/corrugated iron
Cement
46.8
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q4
420
111
180.366784
901.8339
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:37
RWA
Rwanda
38
300,038
10,005
City of Kigali
Nyarugenge
Urban
Dispersed/Isolated housing
House occupied by one household
1
0
2
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
15,000
Month
False
null
null
False
null
null
null
Unprotected spring
2,500
65
Unprotected spring
65
False
Public tap/standpipe
420
Too expensive
No, always sufficient
null
null
false
null
0
No measures
No
Dwelling inappropriate for connection
Candle
null
null
null
null
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
In dwelling, in a sleeping area
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
true
Heavy rain
true
Meetings/trainings
Mud bricks
Metal sheets/corrugated iron
Beaten earth
10.85
true
Breakup of household
Unusually high prices for food
No other shock
null
null
null
null
null
null
Resorted to begging, or to other degrading sources of income, illegal work, or high risk jobs
Resorted to begging, or to other degrading sources of income, illegal work, or high risk jobs
null
HH not recoverd from the shock
HH not recoverd from the shock
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q1
null
111
180.366784
721.46716
Non Extreme Poor
1.0
Moderately poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:38
RWA
Rwanda
39
300,039
10,005
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
0
1
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
30,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
150
10
Public tap/standpipe
10
True
null
null
null
Yes, at least once
null
null
false
null
100
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
false
null
Cost of the serviceis too high
No cooking option at home
null
null
null
null
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
True
5
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
22.15
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q4
150
111
180.366784
180.36679
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:39
RWA
Rwanda
40
300,040
10,005
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
0
2
true
Access to new/different job
Non relative
Tenancy (renting)
null
null
null
12,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
170
10
Public tap/standpipe
10
True
null
null
null
Yes, at least once
null
null
false
null
100
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
0
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
4
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
10.24
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
0
0
0
0
1
0
false
null
null
false
null
null
null
null
No, other place
Q2
170
111
180.366784
180.36679
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:40
RWA
Rwanda
41
300,041
10,005
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by one household
1
0
9
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
15,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
210
20
Public tap/standpipe
20
True
null
null
null
Yes, at least once
null
null
false
null
500
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
2,000
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
22.5
true
Loss or reduced employment or Income for a household member (not counting death)
No other shock
null
null
null
null
null
null
null
Worked longer hours and/or worked more
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
210
111
180.366784
901.8339
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:41
RWA
Rwanda
42
300,042
10,005
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
0
2
true
Evacuated-disaster
Non relative
Tenancy (renting)
null
null
null
15,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
830
90
Public tap/standpipe
90
True
null
null
null
Yes, at least once
null
null
true
600
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
0
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
True
7
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
6.7
true
Loss or reduced employment or Income for a household member (not counting death)
Unusually high prices for food
No other shock
null
null
null
null
null
null
Received help from family and/or friends
Reduced expenditure on food
null
HH not recoverd from the shock
HH not recoverd from the shock
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
830
111
180.366784
180.36679
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:42
RWA
Rwanda
43
300,043
10,005
City of Kigali
Nyarugenge
Urban
Dispersed/Isolated housing
House occupied by multiple Households
1
1
2
false
null
Non relative
Tenancy (renting)
null
null
null
20,000
Month
False
null
null
False
null
null
null
Unprotected spring
2,500
65
Unprotected spring
65
False
Public tap/standpipe
800
Too expensive
Yes, at least once
null
null
true
500
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
500
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
1
Never emptied
null
null
true
Heavy Wind
false
null
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
7.28
true
Loss or reduced employment or Income for a household member (not counting death)
Unusually high prices for food
No other shock
null
null
null
null
null
null
Borrowed money from an informal money lender
Reduced expenditure on food
null
HH not recoverd from the shock
HH not recoverd from the shock
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q1
null
111
180.366784
360.73358
Non Extreme Poor
1.0
Moderately poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:43
RWA
Rwanda
44
300,044
10,005
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
0
7
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
10,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
415
40
Public tap/standpipe
40
True
null
null
null
Yes, at least once
null
null
true
550
0
No measures
No
Application pending
Torch (rechargeable or not)/Phone flashligh
null
null
null
null
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Thrown in the household?s fields or bushes
Pit Latrine with constructed floor slab
True
12
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Beaten earth
5.52
true
Breakup of household
Unusually high prices for food
No other shock
null
null
null
null
null
null
Worked longer hours and/or worked more
Reduced expenditure on food
null
HH not recoverd from the shock
HH not recoverd from the shock
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q3
400
111
180.366784
360.73358
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:44
RWA
Rwanda
45
300,045
10,006
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
Several buildings in a compound occupied by several households
3
0
8
false
null
Non relative
Tenancy (renting)
null
null
null
80,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
1,200
true
20
0
Piped away
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
3,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
3
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
56.7
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
168.962299
337.9246
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:45
RWA
Rwanda
46
300,046
10,006
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
Several buildings in a compound occupied by several households
1
1
8
true
Access to new/different job
Non relative
Tenancy (renting)
null
null
null
17,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
1
600
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, in a sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
6
Never emptied
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
8.75
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
168.962299
168.9623
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:46
RWA
Rwanda
47
300,047
10,006
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
Several buildings in a compound occupied by several households
1
0
1
true
Move to a better neighbourhood
Non relative
Tenancy (renting)
null
null
null
30,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
1
1,500
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, in a sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
2
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
12
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q4
0
111
168.962299
168.9623
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:47
RWA
Rwanda
48
300,048
10,006
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
2
29
3
false
null
Relative
Tenancy (renting)
null
null
null
70,000
Month
False
null
null
True
2,021
6,000,000
Bought
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
0
0
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
Gas
No third fuel
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Social Media
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
40.25
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
168.962299
506.8869
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:48
RWA
Rwanda
49
300,049
10,006
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by one household
4
3
4
true
Get a better house
Private company
Tenancy (renting)
null
null
null
160,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
Yes, at least once
1
12,000
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
9,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
Gas
No third fuel
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Don?t know
null
null
false
null
true
Social Media
Mud bricks with cement
Metal sheets/corrugated iron
Clay tiles
72
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
168.962299
1,013.7738
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:49
RWA
Rwanda
50
300,050
10,006
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by one household
6
40
0
false
null
Head
Owner occupied
60,000,000
300,000
Month
null
null
null
null
null
null
1,982
5,000,000
Constructed
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
1
10,000
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
20,000
true
Wireless
null
Cooking gas stove
Gas
No second fuel
null
In a separate dwelling
Rubbish collection Service
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Clay tiles
93.52
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Reduced expenditure on food
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
168.962299
1,013.7738
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:50
RWA
Rwanda
51
300,051
10,006
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by one household
3
0
6
true
Get a better house
Non relative
Tenancy (renting)
null
null
null
160,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
2
11,500
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
3,500
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Don?t know
null
null
false
null
true
Meetings/trainings
Oven fired bricks with mud
Metal sheets/corrugated iron
Cement
43.47
true
Unusually high prices for food
Failure of a non-agricultural household business
No other shock
null
null
null
null
null
null
Reduced expenditure on food
Borrowed money from a bank
null
HH not recoverd from the shock
HH not recoverd from the shock
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
168.962299
1,351.6984
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:51
RWA
Rwanda
52
300,052
10,006
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
2
0
6
true
Evacuated-disaster
Non relative
Tenancy (renting)
null
null
null
35,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
166
10
Public tap/standpipe
10
True
null
null
null
Yes, at least once
null
null
true
2,100
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
4,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
true
Heavy rain
false
null
Mud bricks with cement
Metal sheets/corrugated iron
Cement
17.1
true
Unusually high prices for food
Serious illness or accident of household member
No other shock
null
null
null
null
null
null
Reduced expenditure on food
Received help from family and/or friends
null
HH not recoverd from the shock
HH not recoverd from the shock
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q4
166
111
168.962299
1,013.7738
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:52
RWA
Rwanda
53
300,053
10,006
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by one household
1
2
1
true
Get a better house
Non relative
Tenancy (renting)
null
null
null
35,000
Month
False
null
null
True
2,019
15,000,000
Bought
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
0
0
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
0
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
false
null
true
Social Media
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
18.25
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
168.962299
168.9623
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:53
RWA
Rwanda
54
300,054
10,007
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
Several buildings in a compound occupied by several households
1
1
8
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
350,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
420
15
Public tap/standpipe
15
True
null
null
null
No, always sufficient
null
null
true
2,100
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
2,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
Gas
No third fuel
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
5
Never emptied
null
null
false
null
true
Meetings/trainings
Mud bricks with cement
Metal sheets/corrugated iron
Cement
28
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
420
111
165.373536
826.8677
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:54
RWA
Rwanda
55
300,055
10,007
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
Several buildings in a compound occupied by several households
1
0
8
true
Renting cost
Non relative
Tenancy (renting)
null
null
null
30,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
1
600
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
2
Never emptied
null
null
false
null
true
Meetings/trainings
Mud bricks with cement
Metal sheets/corrugated iron
Cement
25
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
165.373536
165.37354
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:55
RWA
Rwanda
56
300,056
10,007
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
Several buildings in a compound occupied by several households
1
2
0
false
null
Non relative
Tenancy (renting)
null
null
null
30,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
1
1,200
false
null
0
Piped away
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
3
Never emptied
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
32
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
165.373536
330.74707
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:56
RWA
Rwanda
57
300,057
10,007
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
0
2
true
Access to new/different job
Non relative
Tenancy (renting)
null
null
null
37,000
Month
False
null
null
True
2,022
400,000
Constructed
Public tap/standpipe
100
10
Public tap/standpipe
10
True
null
null
null
No, always sufficient
null
null
false
null
3,000
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
0
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
6
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
33.25
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
100
111
165.373536
661.49414
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:57
RWA
Rwanda
58
300,058
10,007
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by one household
2
25
2
false
null
Head
Owner occupied
4,000,000
5,000
Month
null
null
null
null
null
null
1,998
500,000
Constructed
Public tap/standpipe
100
10
Public tap/standpipe
10
True
null
null
null
No, always sufficient
null
null
false
null
3,000
No measures
Yes from solar
null
Standalone solar system
Solar energy
null
null
null
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
In dwelling, not in sleeping area
Dumped in river/lakes/ditches
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Beaten earth
36.25
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
0
0
0
0
1
0
false
null
null
false
null
null
null
null
No, other place
Q2
100
111
165.373536
826.8677
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:58
RWA
Rwanda
68
300,068
10,008
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by one household
4
3
3
true
Build/buy own house
Spouse with head
Owner occupied
75,000,000
250,000
Month
null
null
null
null
null
null
2,020
50,000,000
Constructed
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
Yes, at least once
1
17,500
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
15,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Social Media
Oven fired bricks with cement
Metal sheets/corrugated iron
Clay tiles
90
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
169.230245
1,015.3815
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:59
RWA
Rwanda
59
300,059
10,007
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by one household
2
8
0
true
Access to new/different job
Non relative
Tenancy (renting)
null
null
null
35,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
30
5
Public tap/standpipe
5
True
null
null
null
No, always sufficient
null
null
false
null
3,000
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
2,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
3
Never emptied
null
null
true
Floods
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
21.73
true
Loss or reduced employment or Income for a household member (not counting death)
No other shock
null
null
null
null
null
null
null
Worked longer hours and/or worked more
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
30
111
165.373536
826.8677
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:60
RWA
Rwanda
60
300,060
10,007
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
1
4
0
false
null
Non relative
Tenancy (renting)
null
null
null
20,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
240
30
Public tap/standpipe
30
True
null
null
null
No, always sufficient
null
null
true
420
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
1,000
false
null
Cost of the serviceis too high
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
True
4
Never emptied
null
null
false
null
true
Radio/TV
Tree trunks with mud and cement
Metal sheets/corrugated iron
Cement
20.85
true
Loss or reduced employment or Income for a household member (not counting death)
Unusually high prices for food
No other shock
null
null
null
null
null
null
Worked longer hours and/or worked more
Reduced expenditure on food
null
HH not recoverd from the shock
HH not recoverd from the shock
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q4
240
111
165.373536
496.1206
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:61
RWA
Rwanda
61
300,061
10,007
City of Kigali
Nyarugenge
Urban
Umudugudu (Planned rural settlement)
House occupied by one household
2
2
10
true
Move to a better neighbourhood
Non relative
Tenancy (renting)
null
null
null
40,000
Month
False
null
null
False
null
null
null
Public tap/standpipe
160
10
Bottled water
null
null
Public tap/standpipe
160
Not safe
No, always sufficient
null
null
true
2,400
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
5,000
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
1
Don?t know
null
null
false
null
true
Meetings/trainings
Mud bricks with cement
Metal sheets/corrugated iron
Cement
39.36
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Reduced expenditure on food
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
165.373536
661.49414
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:62
RWA
Rwanda
62
300,062
10,007
City of Kigali
Nyarugenge
Urban
Spontaneous/informal/unplanned housing
House occupied by multiple Households
2
1
7
true
Access to new/different job
Relative
Tenancy (renting)
null
null
null
40,000
Month
False
null
null
True
2,000
2,000,000
Constructed
Unprotected spring
160
10
Bottled water
null
null
Unprotected spring
160
Not safe
No, always sufficient
null
null
true
100
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
5,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Yes emptied
Service provider
Don?t know
false
null
true
Meetings/trainings
Mud bricks with cement
Metal sheets/corrugated iron
Cement
29.84
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
1
0
0
0
0
0
false
null
null
false
null
null
null
null
No, other place
Q5
0
111
165.373536
496.1206
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:63
RWA
Rwanda
63
300,063
10,008
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by one household
4
1
6
true
Build/buy own house
Spouse with head
Owner occupied
40,000,000
300,000
Month
null
null
null
null
null
null
2,021
40,000,000
Constructed
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
1
12,000
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
10,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
Gas
No third fuel
In a separate dwelling
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Never emptied
null
null
false
null
true
Radio/TV
Oven fired bricks with cement
Metal sheets/corrugated iron
Clay tiles
140
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
169.230245
1,184.6117
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:64
RWA
Rwanda
64
300,064
10,008
City of Kigali
Nyarugenge
Urban
Modern planned urban area
Several buildings in a compound occupied by several households
1
2
0
false
null
Non relative
Tenancy (renting)
null
null
null
30,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
1
600
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
1,500
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In dwelling, not in sleeping area
Rubbish collection Service
Pit Latrine with constructed floor slab
True
3
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
48
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
True
2
0
0
0
0
0
false
null
null
false
null
null
null
null
No, other place
Q5
0
111
169.230245
169.23024
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:65
RWA
Rwanda
65
300,065
10,008
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by one household
4
1
3
true
Move to a better neighbourhood
Head
Owner occupied
80,000,000
350,000
Month
null
null
null
null
null
null
2,022
60,000,000
Constructed
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
Yes, at least once
1
18,000
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
20,000
true
Wireless
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In a separate dwelling
Rubbish collection Service
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Oven fired bricks with cement
Metal sheets/corrugated iron
Clay tiles
188.28
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
169.230245
1,353.8419
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:66
RWA
Rwanda
66
300,066
10,008
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by multiple Households
3
0
3
true
Get a better house
Non relative
Tenancy (renting)
null
null
null
60,000
Month
False
null
null
True
2,019
7,000,000
Constructed
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
No, always sufficient
0
0
true
100
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
3,000
true
Mobile phone
null
Charcoal/fire stove
Charcoal.
No second fuel
null
Outdoors
Rubbish collection Service
Pit Latrine with constructed floor slab
False
null
Don?t know
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
39.75
true
Unusually high prices for food
No other shock
null
null
null
null
null
null
null
Reduced expenditure on food
null
null
HH not recoverd from the shock
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
169.230245
1,523.0721
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:67
RWA
Rwanda
67
300,067
10,008
City of Kigali
Nyarugenge
Urban
Modern planned urban area
House occupied by one household
5
3
5
true
Build/buy own house
Spouse with head
Owner occupied
75,000,000
300,000
Month
null
null
null
null
null
null
2,020
50,000,000
Constructed
Piped into compound, yard/pot
null
null
Bottled water
null
null
null
null
null
No, always sufficient
1
11,000
false
null
0
Ditch
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
False
12,000
true
Mobile phone
null
Cooking gas stove
Gas
Charcoal.
No third fuel
In a separate dwelling
Rubbish collection Service
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Social Media
Oven fired bricks with cement
Metal sheets/corrugated iron
Clay tiles
156
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
111
169.230245
1,015.3815
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
40ea7a58-fde4-4045-b088-a7c85b4fd948:68
RWA
Rwanda
10,597
310,597
11,179
Northern
Musanze
Urban
Modern planned urban area
House occupied by one household
2
3
3
false
null
Non relative
Tenancy (renting)
null
null
null
65,000
Month
False
null
null
False
null
null
null
Piped into compound, yard/pot
null
null
Piped into compound, yard/pot
null
null
null
null
null
Yes, at least once
1
3,000
false
null
0
No measures
Yes on grid
null
Electricity from National Grid (EUCL)
National Grid
null
True
2,000
true
Mobile phone
null
Cooking gas stove
Gas
No second fuel
null
In a separate dwelling
Rubbish collection Service
Flush to pit latrine
False
null
Never emptied
null
null
false
null
true
Radio/TV
Mud bricks with cement
Metal sheets/corrugated iron
Cement
36
false
null
null
null
null
null
null
null
null
null
null
null
null
null
null
null
False
null
null
null
null
null
null
false
null
null
false
null
null
null
null
null
Q5
0
431
257.60582
257.60583
Non Extreme Poor
Non Poor
Non Poor
NISR
EICV7: Household
eicv7_s01_s5_s7_household
40ea7a58-fde4-4045-b088-a7c85b4fd948
40ea7a58-fde4-4045-b088-a7c85b4fd948
https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948/download?format=csv
cc-by-4.0
2026-07-18T11:48:51Z
End of preview. Expand in Data Studio

EICV7: Household | Africa (Rwanda Data Sharing Platform - NISR)

15,054 rows - 1 Africa country/area - 2023-10-16-2024-10-15 - source table - Engineered by Electric Sheep Africa

rows countries period indicators license

TL;DR

This dataset contains 15,054 rows from Rwanda Data Sharing Platform - NISR, covering EICV7: Household. It is published as ML-ready Parquet with consistent Hugging Face metadata, source provenance, and analysis-friendly loading examples.

What This Dataset Measures

Demographic datasets help analysts understand population structure, household conditions, migration, gender, age, and settlement patterns.

Source-provided context: Summary: This microdata table contains information on household characteristics collected in the seventh Integrated Household Living Conditions Survey, known as EICV7 (Enquête Intégrale sur les Conditions de Vie des ménages). A main cross-sectional sample survey, a panel survey and a VUP (Vision Umurenge Programme) sample survey were conducted simultaneously; this microdata table relates to the cross-sectional sample survey. Geographic Coverage: National coverage (Rwanda), including rural and urban households and allowing province- and district-level estimation of key indicators. Time Period: The EICV7 data collection covered a 12 month period (October 2023 to October 2024). In order to represent the seasonality in the income and consumption data, the fieldwork was divided into nine nationally representative cycles. Frequency: The EICV is conducted every three years; prior to EICV4, the survey was conducted every five years, with the first survey (EICV1) conducted in 2000/01.

How To Read This Dataset

  • One row means: one source record from the original tabular resource, with Electric Sheep Africa provenance columns added where available.
  • Primary geography column: country_iso3.
  • Best time column: not detected.
  • Time coverage basis: source metadata period.
  • Recommended join keys: country_iso3 where available plus source-specific keys.

Coverage

Dimension Value
Rows 15,054
Countries/areas 1
First period 2023-10-16
Last period 2024-10-15
Indicators 0
Columns 124
Source format CSV

Geographic Coverage

Top areas shown below, sorted by row count when available:

Area Rows First year Last year Name
RWA 15,054 2023-10-16 2024-10-15 Rwanda

Indicators, Variables, Or Resource Contents

  • This repo preserves one source tabular resource with its usable columns kept together.

Schema

Column Type Description Example
source_record_id string Stable row identifier assigned during Electric Sheep Africa engineering. 40ea7a58-fde4-4045-b088-a7c85b4fd948:0
country_iso3 string ISO3 country or area code. RWA
country_name string Country or area name. Rwanda
id int64 Row ID 1
hhid double Household Identification 300001.0
clust double Cluster 10001.0
province string Numeric code (1–5) representing the administrative province of Rwanda where the survey respondent is located. 1 = Kigali City, 2 = Southern Province, 3 = Western Province, 4 = Northern Province, 5 = Eastern Province. City of Kigali
district string Numeric code (11–57) representing the respondent's district in Rwanda. The first digit corresponds to the province (1-5), and the second digit identifies the district within that province. 11 = Nyarugenge, 12 = Gasabo, 13 = Kicukiro, 21 = Nyanza, 22 = Gisagara, 23 = Nyaruguru, 24 = Huye, 25 = Nyamagabe, 26 = Ruhango, 27 = Muhanga, 28 = Kamonyi, 31 = Karongi, 32 = Rutsiro, 33 = Rubavu, 34 = Nyabihu, 35 = Ngororero, 36 = Rusizi, 37 = Nyamasheke, 41 = Rulindo, 42 = Gakenke, 43 = Musanze, 44 = Burera, 45 = Gicumbi, 51 = Rwamagana, 52 = Nyagatare, 53 = Gatsibo, 54 = Kayonza, 55 = Kirehe, 56 = Ngoma, 57 = Bugesera. Nyarugenge
ur string Residence area Urban
s5aq1 string Type of habitat Umudugudu (Planned rural settlement)
s5aq2 string Type of dwelling House occupied by multiple Households
s5aq3 int64 Number of rooms does your household have for sleeping 2
s5aq4y int64 Duration household inhabited dwelling (years) 0
s5aq4m int64 Duration household inhabited dwelling (months) 2
s5aq5 bool Household lived in other dwellings before occupying your current house True
s5aq6 string Main reason for moving to current dwelling Get a better house
s5aq7 string Owner of the dwelling Non relative
s5aq8 string Current occupancy status Tenancy (renting)
s5bq1 double The current value of your dwelling if you were to sell it ``
s5bq2a double Estimated rent for dwelling ``
s5bq2b string Time period ``
s5bq3a double Actual amount of rent paid in cash 150000.0
s5bq3b string Time period Month
s5bq4 string Household provide service/payments in kind False
s5bq5a double Amount of services/payment in kind ``
s5bq5b string Time period ``
s5bq6 string Do you own a residential house in this village or elsewhere False
s5bq7 double In which year did you acquire that house ``
s5bq8 double What was the value of that house when you acquired it ``
s5bq9 string How did you acquire that house ``
s5cq1 string Main source of water used for your household Piped into compound, yard/pot
s5cq2a double Distance in meters between your dwelling and this source ``
s5cq2b double Time in minutes it take to go there, to get water and come back ``
s5cq3 string Main source of drinking water for members of your household Bottled water
s5cq4b double Time in minutes it take to go there, to get water and come back ``
s5cq5 string Is this source the nearest to your dwelling ``
s5cq6a string Unused nearest drinking water source to your dwelling ``
s5cq6b double Distance in meters between your dwelling and unused nearest drinking water source ``
s5cq7 string Main reason preventing your HH to use the nearest drinking water source ``
s5cq8 string In the last 4 weeks has there been anytime when your HH deed not have sufficient water Yes, at least once
s5cq9a double Amount of last water bill from WASAC or other distributors (month) 1.0
s5cq9b double Amount of last water bill from WASAC or other distributors - Amount 2010.0
s5cq10 bool Did you buy water from a private vendor/neighbour during the last 7 days False
s5cq11 double Amount paid to private water vendor last 7 days ``
s5cq12 int64 Amount contribute to maintain the water source during the last month 0
s5cq13 string Household manage the rainwater No measures
s5cq14 string Is this HH connected to the grid (electricity from the grid) Yes on grid
s5cq15 string Main reason your household is not connected to the electricity grid ``
s5cq16 string Main source energy for home lighting Electricity from National Grid (EUCL)
s5cq17 string Main source of electricity that you mostly used in your household National Grid
s5cq18 string Main reason preventing your household to use electricity for lighting ``
s5cq19 string Appliances get damaged/electrical system (voltage surges) False
s5cq20 double Amount your household pay for electricity the last 4 weeks 3000.0
s5cq20a bool Does your household have an internet connection True
s5cq20b string What is the main kind of internet connection used by household members Mobile phone
s5cq20c string What is the main barrier/reason for not accessing internet at home ``
s5cq21 string Type of your primary cook stove Charcoal/fire stove
s5cq22a string Three main sources of cooking fuel you used on this cook stove - Most used (Primary) Charcoal.
s5cq22b string Three main sources of cooking fuel you used on this cook stove - Second most used No second fuel
s5cq22c string Three main sources of cooking fuel you used on this cook stove - Third most used ``
s5cq23 string Where did you normally cook with the cook stove In a separate dwelling
s5cq24 string How does your household dispose of its rubbish/garbage Rubbish collection Service
s5cq25 string What type of toilet does your household use Ventilated improved pit (VIP) latrine
s5cq26 string Is the toilet facility shared with another household False
s5cq27 double Number of households in total use this toilet facility, including your own house ``
s5cq28 string Has your (pit latrine or septic tank) ever been emptied Don?t know
s5cq29 string Who removed the content of toilet last time it was empted ``
s5cq30 string Where were the contents emptied to ``
s5cq31 bool Faced any problems that resulted from environmental destruction in the previous 12 months False
s5cq32 string Main disaster you have experienced with your dwelling ``
s5cq33 bool Have you received any environmental information in the last 12 months True
s5cq34 string Main source of information on environmental issues Radio/TV
s5dq1 string Main construction material of exterior wall Tree trunks with mud and cement
s5dq2 string Main roofing material for dwelling Metal sheets/corrugated iron
s5dq3 string Main floor material for dwelling Clay tiles
s5dq4 double Area of the floor for dwelling-outside 48.0
s5eq1 bool Unsual negative situation affected household False
s5eq2a string Main problems affecting your household during the last 12 months (1st severe shock) ``
s5eq2b string Main problems affecting your household during the last 12 months (2nd severe shock) ``
s5eq2c string Main problems affecting your household during the last 12 months (3rd severe shock) ``
s5eq2aa_m double Main problems affecting your household during the last 12 months (1st severe shock) - When did this situation happen to your household (Month) ``
s5eq2ab_m double Main problems affecting your household during the last 12 months (2nd severe shock) - When did this situation happen to your household (Month) ``
s5eq2ac_m double Main problems affecting your household during the last 12 months (3rd severe shock) - When did this situation happen to your household (Month) ``
s5eq2aa_y double Main problems affecting your household during the last 12 months (1st severe shock) - When did this situation happen to your household (Year) ``
s5eq2ab_y double Main problems affecting your household during the last 12 months (2nd severe shock) - When did this situation happen to your household (Year) ``
s5eq2ac_y double Main problems affecting your household during the last 12 months (3rd severe shock) - When did this situation happen to your household (Year) ``
s5eq3a string What did the household do to compensate for the consequences of the shock in the last 12 months (1st severe shock) ``
s5eq3b string What did the household do to compensate for the consequences of the shock in the last 12 months (2nd severe shock) ``
s5eq3c string What did the household do to compensate for the consequences of the shock in the last 12 months (3rd severe shock) ``
s5eq4a string Number of months did it take your HH to recover from the recent shock and get back to normal life, as if before the shock (1st severe shock) ``
s5eq4b string Number of months did it take your HH to recover from the recent shock and get back to normal life, as if before the shock (2nd severe shock) ``
s5eq4c string Number of months did it take your HH to recover from the recent shock and get back to normal life, as if before the shock (3rd severe shock) ``
s7aq4 string Did any member of your household own and/or raise any livestock, herds, other farm animals, or poultry in the last 12 months ``
s7aq4a double How many of the following livestock or poultry does the household own - Cattle ``
s7aq4b double How many of the following livestock or poultry does the household own - Goats ``
s7aq4c double How many of the following livestock or poultry does the household own - Sheep ``
s7aq4d double How many of the following livestock or poultry does the household own - Pigs ``
s7aq4e double How many of the following livestock or poultry does the household own - Poultry ``
s7aq4f double How many of the following livestock or poultry does the household own - Other (Specify) ``
s7a2q1 bool Have you ever received a cow from the Government's one cow per poor family policy ``
s7a2q2 double In what year did you receive this animal ``
s7a2q3 string Do you still keep this animal ``
s7a2q4 bool Household ever receiced animal from NGO or other social protection scheme ``
s7a2q5a double Kind of animal 1st ``
s7a2q6a string Has the number of animals changed (Cow poor family) ``
s7a2q6b string Has the number of animals changed (1st animal from NGO) ``
s7a2q6c string Has the number of animals changed (2nd animal from NGO) ``
s7a2q7 string Household uses a maintained pasture ``
quintile string Quintiles of real consumption per ae ``
s5cq4a double Distance in meters between your dwelling ``
strata_id int64 Strata ID ``
weight double Household Weight ``
pop_wt double Population Weight ``
epov_jan string Extreme Poverty ``
pov_jan string Poverty Rate ``
poverty string Welfare Categories ``
source_provider string Publishing organization. ``
source_dataset string Source dataset or package title. ``
source_resource string Source resource title, table name, or file name. ``
source_package_id string Source package identifier. ``
source_resource_id string Source resource identifier. ``
source_url string Original source URL or download URL. ``
license_id string Source license identifier. ``
retrieved_at string UTC source retrieval timestamp from the Electric Sheep Africa pipeline. ``

Usage

from datasets import load_dataset

ds = load_dataset("electricsheepafrica/africa-rwanda-eicv7-household-ded0eb3c")
df = ds["train"].to_pandas()
print(df.head())

Inspect Columns

print(df.info())
print(df.head())

Filter By Geography

if "country_iso3" in df.columns:
    sample = df[df["country_iso3"] == "RWA"]

Time-Series Pattern

if "value" in df.columns and "year" in df.columns:
    trend = df.sort_values("year")

Pivot For Analysis

if {"indicator_id", "year", "value"}.issubset(df.columns):
    matrix = df.pivot_table(index="year", columns="indicator_id", values="value")
    print(matrix.tail())

Data Quality Notes

  • No canonical year/date column was detected in the packaged table; use source metadata and domain context for temporal interpretation.
  • Missing values are preserved rather than silently imputed.
  • Column names are standardized for machine use; source meanings are preserved where known.
  • Always confirm source methodology, units, and collection definitions before policy, production, or redistribution-sensitive use.

Source And Provenance

Transformations Applied

  • Converted the source table to Parquet for efficient analytics and ML workflows.
  • Added or preserved source provenance columns where available.
  • Standardized README metadata, dataset loading configuration, schema documentation, and citation format.
  • Preserved source-reported values without analytical imputation.

Suggested Analyses

  • Build demographic profiles
  • Normalize indicators per capita
  • Join with service-delivery datasets
  • Check missingness before modeling
  • Use country_iso3 as the safest geography join key when present

Citation

@misc{electric_sheep_africa_africa_rwanda_eicv7_household_ded0eb3c_2024,
  title        = {EICV7: Household | Africa (Rwanda Data Sharing Platform - NISR)},
  author       = {NISR},
  year         = {2024},
  url          = {https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948},
  publisher    = {Hugging Face Datasets, engineered by Electric Sheep Africa},
  howpublished = {\url{https://huggingface.co/datasets/electricsheepafrica/africa-rwanda-eicv7-household-ded0eb3c}}
}

License

Released under CC BY 4.0.

Original data is published by NISR. Electric Sheep Africa engineering standardizes the data for discovery, loading, and analysis on Hugging Face. Cite both the original source and this ML-ready dataset when used.

About Electric Sheep Africa

Electric Sheep Africa publishes ML-ready African public datasets on Hugging Face.


Provenance: README standardized 2026-08-12 by the Electric Sheep Africa README system. Source URL: https://api.data.gov.rw/api/v1/datasets/public/40ea7a58-fde4-4045-b088-a7c85b4fd948

Downloads last month
21

Collection including electricsheepafrica/africa-rwanda-eicv7-household-ded0eb3c